Two days! That is how long it took to install this Modulo solution in Papendrecht, The Netherlands.
Modulo just completed installation of one of its solutions ( 80 modular elements) in just 2 days! The installation occurred in Papendrecht, The Netherlands. Installation of the roofing system, lightning systems are being finalized within the next few days. For the production of the blocks recycled concrete “ eco-granulate” was used.
From start to finish this project took 16 weeks only.
Reasons for choosing Modulo as the preferred solution:
– the lowest costs over the lifetime of the project
– its great flexibility
– sustainability
– the use of recycled concrete
– no footings required since the load factors for the system are substantially less as compared to other solutions.
Elevated drop off solutions ensure complete separation between truck traffic and residential/ small business traffic, better logistics, safer working environment, better bin filling rates and lower costs of logistics and improved user and customer satisfaction ultimately.