Drop off center in France
Two transfer stations installed by Modulo within 4 days and being used already. Both structures are located under the A86 motorway for optimized space use. Modulo was the preferred solution because it could be installed in a very short time
Drop Off Solutions Papendrecht, The Netherlands
Two days! That is how long it took to install this Modulo solution in Papendrecht, The Netherlands. Modulo just completed the installation of one of its solutions ( 80 modular elements) in just 2 days! The installation occurred in Papendrecht, The
Convenience Center, Woerden, The Netherlands
Woerden, The Netherlands recycling site has heat traced ramps and facilitates offices, storage, reuse, and HHW underneath the deck. The site is in compliance with all European Regulations (Guidelines for Environmental Protection Measures and Chemical Waste Storage, National and International
Drop Off Solutions in Hamburg, Germany
Hamburg desired a sustainable flexible, multi-functional solution providing them the best lifetime costs performance. The site has heat traced ramps, roofing, and facilitates offices, storage, reuse, and HHW underneath the deck. The site is in compliance with all European and
Recycling Site in Als Denmark
The recycling site in Als was the first modular solution in Denmark and was supplied by Modulo concrete. The recycling site, which was officially opened in July 2011, is located in Als and is run by I / S Joint
Candiac Contract Award
On July 23 Candiac, Quebec selected Modulo to supply and install the patented modular Modulo EcoCentre/ public drop off solution. The ecocenter will be installed early September 2019, which is less than 2 months after the contract award. Modulo is steadily
Transfer Station Aubervilliers Plaine Commune, France
Two transfer stations installed by Modulo within 4 days and being used already. Both structures are located under the A86 motorway for optimized space use. Modulo was the preferred solution because it could be installed in a very short time