Drop off center in France
Two transfer stations installed by Modulo within 4 days and being used already. Both structures are located under the A86 motorway for optimized space use. Modulo was the preferred solution because it could be installed in a very short time
Drop Off Solutions Papendrecht, The Netherlands
Two days! That is how long it took to install this Modulo solution in Papendrecht, The Netherlands. Modulo just completed the installation of one of its solutions ( 80 modular elements) in just 2 days! The installation occurred in Papendrecht, The
Residential drop off Solution Paderborn Germany
Modulo recently completed its new residential and small businesses drop off solution/ recycling center for Paderborn Germany. Immediately after installation, residents started to use the facility. Modulo was involved from start to finish as well as maintenance. Modulo provided consultancy
Waste Recycling Centre Älta Kretsloppscentral, Sweden
Modular construction Modulo concrete modules that form the base of the recycling facility including finished bathroom/bathrooms and meeting room/ education /room were installed within 5 days. Recycling and a creative studio for teaching Under the 9.8 ft high modules a lot of space
Recycling Station Guderup, Danmark
Guderup recycling site is a good example showing that it is possible with relatively low investment to get an upgraded drop off site turning it into a more modern site, In addition, a very short construction period was established: installation
New Ecocenter Solution in Lemmer by Modulo
Modulo has installed a new eco-centre solution in Lemmer, The Netherlands. The site includes hazardous waste. The project was installed within 1 week. The system is replacing the site previously used to accept residential and small business drop off items.
Candiac Contract Award
On July 23 Candiac, Quebec selected Modulo to supply and install the patented modular Modulo EcoCentre/ public drop off solution. The ecocenter will be installed early September 2019, which is less than 2 months after the contract award. Modulo is steadily